Our Project – gulfenc

OUR PROJECTS

Jubail Desalination plant

 Jubail Industrial City
Desalination plant


Hilton Hotel

NEOM CITY
Main Contractor : BEC Arabia
Construction Company in UAE and KSA | BEC Arabia

Al Baha Museum

Government
Ministry of Tourism and Antiquities
Type of Work Carried out : Built-in central units (Package)
Project Site: Al-Baha, Al-Hazm District

Lara Terrace

Private
company owner: Admas Co.
Type of Work Carried out : Ducted Air Conditioner
Project Site: Riyadh, Al-l Wurud District

Yara Avenue

Private
company owner: Admas Co.
Type of Work Carried out : Ducted Air Conditioner
Project Site: Riyadh, King Abdullah District

Taibah University

Community College
Government
Ministry of Education
Type of Work Carried out : Water Chiller
Project Site: Al-Medinah

TBC Trading Company

Government Co.
Owner: Public Investment Fund.
Project Site: Riyadh

Community College

Community College
Government
Ministry of Education
Type of Work Carried out : Water Chiller
Project Site: Al-Kharj

Al-Issa Building Co.

Type of Work Carried out : Built-in central units (Package – 880 Tons)
Project Date: 2014
Location: Riyadh Cit

Civil Defense

Government Building
Supervisor: Saud Consult Office
Type of works performed: Ducts and outside air ventilation and air conditioning, air conditioning units, intake fans (integrated central units (Package)
Cooling capacity = 625 tons
Project Date: 2005 AD
Project Location: Riyadh City – Al Sulai District

Hyatt Place Hotel Air conditioning

4-star residential hotel
Owner: Hyatt Group Company
Type of works performed: Daikin Units (VRV)
Cooling capacity (540 tons)
Project Date: 2018
Project Location: Riyadh City

czech center for physiotherapy

Location: Riyadh City

Jeddah Girls Technical college

Owner: Government building of the General Administration of Technical and Vocational
Education Type of work carried out: Frozen Water Units (Water Chiller)
Cooling Capacity (1770 tons)
Project Date: 2014
Project Location: Jeddah City

Arab National Bank

  • Owner: Arab National bank
  • Type of work performed: Integrated central units (Package)
  • cooling capacity (125 tons)
  • project date: 2007
  • Location: buraida city

Request your project, follow it and document it online, in cooperation with the experts and engineers of the Gulf Encyclopedia for Adaptation

Scroll to Top